发明名称 SYSTEM AND METHOD FOR OPERATING AN INFILL AND/OR A STEP-OUT WELL FOR IN SITU BITUMEN RECOVERY
摘要 <p>A method is provided for injecting solvent into a bitumen reserve at a well. The well is located adjacent at least one steam assisted gravity drainage (SAGD) well pair in the bitumen reserve, and includes an infill well or a step-out well. The method includes injecting a first solvent into the bitumen reserve at the well, wherein a region of the bitumen reserve near the well is at a first temperature. The method also includes, at a later time when the region of the bitumen reserve is at a second temperature higher than the first temperature, injecting a second solvent into the bitumen reserve at the well, wherein the second solvent has a higher boiling point than the first solvent and the first and second solvents are operable to reduce the viscosity of the bitumen in the reserve.</p>
申请公布号 CA2875846(A1) 申请公布日期 2015.03.04
申请号 CA20142875846 申请日期 2014.12.22
申请人 SUNCOR ENERGY INC. 发明人 IRANI, MAZDA
分类号 E21B43/24;E21B43/22 主分类号 E21B43/24
代理机构 代理人
主权项
地址