发明名称 CONSTRUCTION METHOD FOR FOUNDATION
摘要 <p>PROBLEM TO BE SOLVED: To provide a construction method for a foundation capable of bearing earth pressure from backfill soil, even when a width-stop member is not erected within a form.SOLUTION: In a construction method for a foundation, an excavated ditch is formed in a position of each side of a rectangular compartment by excavating the ground; a mold form is installed within the formed excavated ditch; and the periphery of the installed mold form is backfilled. After the mold form is installed, a tension member is erected between the mutually-opposed sides of the mold form.</p>
申请公布号 JP2015038265(A) 申请公布日期 2015.02.26
申请号 JP20110261777 申请日期 2011.11.30
申请人 KOSHIN KENSETSU KK 发明人 TANUMA KENJI
分类号 E02D27/01 主分类号 E02D27/01
代理机构 代理人
主权项
地址