发明名称 CONSTRUCTION METHOD OF PROCESS BRANCH OF VERTICAL WELL SHAFT AND DEVICE FOR ITS IMPLEMENTATION
摘要 FIELD: mining.SUBSTANCE: method involves installation of a sinking tower, driving of a shaft at least with one mine mini excavator with a replaceable hydraulic hammer. Tubing lining of the shaft is performed using a unit moving in the shaft. Installation of tubing is performed using a tubing hydraulic claw with a counter-weight, which is arranged on an overhead crane moved with manually driven crabs.EFFECT: acceleration of driving of a process branch from construction of a mouth to construction of a support of the process branch.5 cl, 3 dwg
申请公布号 RU2539454(C1) 申请公布日期 2015.01.20
申请号 RU20130151152 申请日期 2013.11.19
申请人 KISEL' ALEKSANDR ALEKSANDROVICH 发明人 KISEL' ALEKSANDR ALEKSANDROVICH
分类号 E21D1/03 主分类号 E21D1/03
代理机构 代理人
主权项
地址