摘要 |
FIELD: mining.SUBSTANCE: method involves installation of a sinking tower, driving of a shaft at least with one mine mini excavator with a replaceable hydraulic hammer. Tubing lining of the shaft is performed using a unit moving in the shaft. Installation of tubing is performed using a tubing hydraulic claw with a counter-weight, which is arranged on an overhead crane moved with manually driven crabs.EFFECT: acceleration of driving of a process branch from construction of a mouth to construction of a support of the process branch.5 cl, 3 dwg |