发明名称 |
TRAVELLING FORM AND HARBOR STRUCTURES USING THIS CONSTRUCTION METHOD |
摘要 |
Provided are a construction device of cap concrete and a construction method of cap concrete using the same which enable the easy construction of cap concrete on a concrete caisson previously manufactured, and reduces the use of equipment and construction costs by controlling the use of a crane. To achieve the purpose, the construction device of the cap concrete according to the present invention comprises a buried member which is fixed to a top end wall (110) of the concrete caisson; cap brackets which are installed on the buried member at uniform intervals; and a moving device which is used as a form and is fixed to the cap brackets. The construction method of cap concrete using the construction device comprises the steps of: burying the buried member in the top end wall of the concrete caisson (SI); fixing the cap brackets to the buried member at uniform intervals (SII); fixing the moving device having a form function to the cap brackets (SIII); constructing cap concrete by placing concrete in the moving device and curing the placed concrete(SIV); separating the moving device from the concrete caisson after the construction of the cap concrete (SV); moving the separated moving device to the cap brackets of the concrete caisson using a winch (SVI); and repeating the SII to SVI steps to construct the cap concrete on the top of the concrete caisson. |
申请公布号 |
KR101474555(B1) |
申请公布日期 |
2014.12.22 |
申请号 |
KR20130076727 |
申请日期 |
2013.07.01 |
申请人 |
WOOJINFORMTECH CO., LTD.;SAMSUNG C&T CORPORATION |
发明人 |
OH, SUNG KEUN;KIM, SEOK WON;JANG, GUN TAE |
分类号 |
E02D23/00;E02D23/02 |
主分类号 |
E02D23/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|