摘要 |
FIELD: oil and gas industry.SUBSTANCE: according to the method the well is killed, the sand plug is washed and hydraulic fracturing of the formation is made with its simultaneous setting within the whole perforation interval. Volume of the well bottomhole zone within the perforation interval is divided into two production facilities by injecting and flushing of waterproofing compound to the formation depth radially thus forming water shutoff screen. Time is withheld for hardening of the waterproofing compound. The well volume at the water shutoff screen level is divided into two production zones by setting a packer run in with the tubing string. The tubing string is equipped with a gas lift valve in the upper part of the upper facility perforation interval. The string shoe is set at the level of 1.5-2m below the lower openings in the lower facility perforation interval and water extraction is made by intrawell gaslift from the lower production facility due to gas energy from the upper production facility.EFFECT: improved productivity of wells due to recovery of wet gas or gas condensate wells, prevention of their further drowning and self-killing, increased life between overhauls.3 cl, 1 ex |