摘要 |
<p>PROBLEM TO BE SOLVED: To realize a steel sheet pile and a press-in method of the steel sheet pile, capable of suitably correcting an attitude of a sheet pile row inclined in the crossing direction with the construction progress direction.SOLUTION: In the steel sheet pile 10, a pair of joints 12 and 13 are provided on both sides of a sheet pile body 11, and the attitude of the sheet pile row inclined at an angleθin the crossing direction with the construction progress direction is suitably corrected by using the steel sheet pile 10 of forming the angleθby the extension direction of one joint 12 and the extension direction of the other joint 13.</p> |