摘要 |
<p>PROBLEM TO BE SOLVED: To enhance prediction accuracy of time until a measuring object distributed to a weight rank reaches a summary target value.SOLUTION: A weight sorter distributes to distribution positions (1)-(8) corresponding to the determined weight rank, by determining the weight rank by measuring weight of a measuring object 13 supplied via a supply conveyor 4 by manual work of an operator 50, and calculates prediction time until a present summary value of the measuring object 13 in accordance with the weight rank becomes a summary target value on the basis of the summary target value in accordance with the weight rank, a summary value of the measuring object 13 in accordance with the weight rank, a measuring speed corresponding to a present supply state and a distribution probability of the weight of the measuring object in accordance with the weight rank.</p> |