摘要 |
A production line (100,200,300,400) for manufacturing wound core components (10,10') of a dynamo electric machine, comprising a central processing zone (101) provided with at least a winder (104,104') for winding coils (15) to produce wound core components, a downstream processing zone (111) for finishing the wound core components. The production line further comprises a first load and unload device (105) for transferring the core components to be wound to at least a winder (104,104') from a waiting position (103a), or from an upstream transport carrier (108a), located at a first position (G), for transferring core components to be wound from an upstream processing zone (201). The first load and unload device (105) transferring wound core components from the at least a winder (104,104') to a downstream transport carrier (108b), located at a second position (A), for transferring wound core components to the downstream processing zone (111). |