发明名称 |
GROUND IMPROVEMENT METHOD |
摘要 |
PROBLEM TO BE SOLVED: To provide a ground improvement method for achieving construction at low cost with low noise and low vibration.SOLUTION: A ground improvement method comprises the steps of: (a) intruding a hollow cylinder into the ground; (b) filling soil which is generated at a site of construction into the cylinder; (c) intruding a pressurizing tool having a pressurizing body at an end thereof into the cylinder so as to consolidate the soil which is generated at the site of construction and filled into the cylinder; (d) pulling out the pressurizing tool; performing the steps (b) to (d) a plurality of times so as to construct an improved body which is consolidated in a height direction in the ground; and pulling out the cylinder. |
申请公布号 |
JP2014189972(A) |
申请公布日期 |
2014.10.06 |
申请号 |
JP20130064233 |
申请日期 |
2013.03.26 |
申请人 |
KANEMATSU NNK CORP;ART CRANE CO LTD |
发明人 |
MIZUTANI YOSUKE;NAKAMURA HIROSHI;YAMAGUCHI YOSHIHIRO |
分类号 |
E02D3/08;E02D27/34 |
主分类号 |
E02D3/08 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|