发明名称 Power supply control method, an optical network unit, an optical line terminal and a communication system
摘要 In an optical communication system that communicates between an optical line terminal (OLT) and a plurality of optical network units (ONU), an ONU can decide an operation time period of communicating with the OLT and an idle time period of reduced or suspended communication with the OLT by using a timer. The OLT can decide a software renewal time period based on the operation time period and the idle time period. Accordingly, the ONU can supply electrical power to its own communication circuit during the operation time period or the software renewal time period, or cut off or reduce the electrical power if a present time does not occur in either the operation time period or the software renewal time period.
申请公布号 US8837944(B2) 申请公布日期 2014.09.16
申请号 US201213431969 申请日期 2012.03.27
申请人 Oki Electric Industry Co., Ltd. 发明人 Sarashina Masahiro;Furusawa Satoshi
分类号 H04J14/00;H04B10/00;H04J14/02;H04Q11/00 主分类号 H04J14/00
代理机构 Rabin & Berdo, P.C. 代理人 Rabin & Berdo, P.C.
主权项 1. A power supply control method comprising the steps of: determining, by an Optical Network Unit (ONU), an operation time period corresponding to a communication mode that supplies electrical power to a communication circuit, and an idle time period corresponding to a sleep mode that cuts off or reduces the electrical power to the communication circuit; transmitting from the ONU to an Optical Line Terminal (OLT) an operation time information signal that indicates the operation time period and the idle time period; receiving, by the OLT, the operation time information signal; determining, by the OLT, a software renewal time period based on the operation time information signal; transmitting from the OLT to the ONU a software renewal time information signal that indicates the software renewal time period; receiving, by the ONU, the software renewal time information signal; and by the ONU, based on determining that a present time is in the operation time period or the software renewal time period, supplying the electrical power to the communication circuit during the operation time period or the software renewal time period, or based on determining that the present time is not in the operation time period or the software renewal time period, cutting off or reducing the electrical power to the communication circuit; wherein the step of determining at the OLT the software renewal time period further comprises the steps of: receiving from the ONU an operation time information signal indicating the operating time period and the idle time period; generating a management table based on the operation time information signal; storing at least one of the idle time period or the operation time period in the management table; and determining the software renewal time period based at least partly on at least one of the idle time period or the operation time period of the management table.
地址 Tokyo JP