发明名称 STUD MAPPING AND LAYOUT METHOD
摘要 A method of establishing the location of a pair construction points for a stud in a building interior at a construction site and for determining the length of the stud needed to extend between the pair of construction points uses a robotic total station. The points are defined by x and y coordinates and anticipated z coordinates on upper and lower surfaces. The robotic total station establishes the points by directing a beam of laser light toward anticipated points and, through an iterative process, determining the actual location of the points on upper and lower surfaces that have the same x and y coordinates.
申请公布号 US2014253903(A1) 申请公布日期 2014.09.11
申请号 US201313784992 申请日期 2013.03.05
申请人 TRIMBLE NAVIGATION LIMITED 发明人 Miller Robert Michael;McCartney James M.
分类号 G01C3/08 主分类号 G01C3/08
代理机构 代理人
主权项 1. A method of establishing the location of a pair construction points for a stud in a building interior at a construction site and for determining the length of the stud needed to extend between said pair of construction points, where the points are defined by x and y coordinates, comprising the steps of: generating a beam of laser light, directing the beam of laser light toward a first of the construction points, determining the distance from the source of the laser light to a point on the actual building surface which is illuminated by the beam, and if the distance from the source of the laser light to the point on the actual building surface is greater or less than anticipated, determining an updated construction point, directing the beam at the updated construction point, and determining the distance to the illuminated point on the actual building surface until the distance from the source of the laser light to the point on the actual building structure is substantially equal to that anticipated, whereby a first point on the actual building surface having said x and y coordinates is established, directing the beam of laser light toward the second of the construction points, determining the distance from the source of the laser light to a point on the actual building surface which is illuminated by the beam, if the distance from the source of the laser light to the point on the actual building surface is greater or less than anticipated, determining an updated construction point, directing the beam at the updated construction point, and determining the distance to the illuminated point on the actual building surface until the distance from the source of the laser light to the point on the actual building structure is substantially equal to that anticipated, whereby a second point on the actual building surface having said x and y coordinates is established, and determining the vertical distance between the first and second points, whereby the difference in the z coordinates defines the length of the stud needed to extend between said selected pair of construction points.
地址 US