摘要 |
<p>A method for increasing similarity between a base seismic survey and a monitor seismic survey of a same surveyed subsurface during a 4-dimensional (4D) project. The method includes receiving first seismic data associated with the base seismic survey; receiving second seismic data associated with the monitor seismic survey, wherein the monitor seismic survey is performed later in time than the base seismic survey; migrating the first and second seismic data to an image-domain; and calculating, with a processor, a set of decimating weights based on the migrated first and second seismic data in the image-domain, to maximize a similarity between the first seismic data and the second seismic data.</p> |