摘要 |
The present invention relates to a steep conveying installation (1) for arranging on a slope (10) of an open‑cast mining glory hole, by means of which raw materials (11) can be transported from a lower height level (12), in particular from a mining floor (12) of the open‑cast mine, to an upper height level (13), in particular formed by a soil (13), comprising a line (14) arranged on the slope (10). According to the invention, a first conveying basket (15) and a second conveying basket (16) are provided, which conveying baskets (15, 16) can be displaced on the line (14) between the lower height level (12) and the upper height level (13) and which are designed to receive the raw materials (11), wherein the conveying baskets (15, 16) are connected to one another via at least a common traction means (17). |