摘要 |
The method involves processing mechanical operations e.g. riveting operations at each structural component section. Structural components (2a-2f) are successively conveyed through working areas (8a-8e) of processing stations (3a-3e). The areas are allocated with the components and/or the section according to a production cycle. A processing sequence is determined for the cycle. Estimated or actual allocation of the areas is determined. The operations are determined from the allocation. The sequence is optimized by the operations. The optimized sequence for automatic processing is stored. An independent claim is also included for a sequence control system for a linked production line for processing airplane-structural components. |