摘要 |
PROBLEM TO BE SOLVED: To allow a pin connection between a structure part and a beam part to be simply formed.SOLUTION: In a pin connection structure of a beam, an end of a concrete beam part 2 and a side part of a concrete structure part 1 are connected to each other by pins. In this case, a pin connection member 7 is provided with: a beam part embedded part 7b embedded in the end of the beam part 2 and assuring an adhesive force; a structure part embedded part 7a embedded in the structure part 1 and assuring an adhesive force; and an intervention part 7c interposed between the beam part embedded part 7b and the structure part embedded part 7a and transmitting a shear force between the beam part 2 and the structure part 1. The pin connection member 7 is embedded over the beam part 2 and the structure part 1. |