发明名称 Managing Job Execution
摘要 This disclosure describes monitoring the execution of jobs in a work plan. In an embodiment, a system maintains a risk level associated with the critical job to represent whether the execution of a job preceding the critical job has a problem, and it maintains the list associated with the critical job so as to quickly identify the preceding job which may cause a delay to the critical job execution.
申请公布号 US2014196057(A1) 申请公布日期 2014.07.10
申请号 US201414206310 申请日期 2014.03.12
申请人 Cardelli Marco;Lannucci Pietro;Perticara Valeria;Salem Randa 发明人 Cardelli Marco;Lannucci Pietro;Perticara Valeria;Salem Randa
分类号 G06F9/48 主分类号 G06F9/48
代理机构 代理人
主权项 1. A method comprising: receiving a workload plan of jobs, wherein the workload plan of jobs includes a critical job and a predecessor job, wherein the predecessor job must complete execution before the critical job can begin execution, and wherein the critical job must be completed by a deadline; monitoring execution of jobs in the workload plan; receiving the execution status of the predecessor job, wherein the execution status of the predecessor job corresponds to at least one of a job event or an infrastructure event; detecting a delay condition for the predecessor job; determining an ability of the critical job to complete its execution before the deadline based on an execution status of the predecessor job; and updating a risk level associated with the critical job based on the determination of the ability of the critical job to complete its execution before the deadline; wherein the critical job and the predecessor job are in a critical path comprising one or more successor jobs which are successors to said predecessor job and must complete execution before the critical job can begin execution.
地址 Rome IT