摘要 |
A peak control method is provided to perform a proper peak control by automatically adding a power capacity value of an additional device to a power capacity value of an existing device. A central controller checks a power capacity value of an additional device during a trial test(S200). The central controller adds the power capacity value of the additional device to a power capacity value of an existing device. The central controller calculates an operating rate of currently operating devices by using the added power capacity value and control/monitoring state information(S201). The central controller checks whether the operating rate of the currently operating devices exceeds a predetermined target rate or not(S202). The central controller performs a peak control in exceeding the target rate(S203). |