摘要 |
A process for the production of ballast for railway track laying, road construction, dam construction and bank protection, wherein ballast stones are spread out to form ballast and a reaction mixture for the preparation of a polyurethane foam, produced from components by a low-pressure process, is applied between the spread ballast stones. |