摘要 |
PROBLEM TO BE SOLVED: To provide a gable tile for a bottom stage, surely leading rainwater collected in the lower end of suspended portion of a gable tile at the second stage from the lower side into a rain gutter at an eaves.SOLUTION: A gable tile for a bottom stage includes a body part 2 covering the top face of a roofing material and a suspended portion 3 suspended downward at the gable end side end edge of the body part 2, and is roofed at the bottom of a roof. In the gable tile, a guideway 11, for leading water droplets received from the lower end of the suspended portion of the gable tile 21 roofed at the second stage from the lower side to a rain gutter 23 so as to avoid a barge board 22, is formed on an outside surface of the suspended portion 3. Preferably, a direction conversion member 11a, for converting the flowing-down direction of water droplets so as to drop into the rain gutter 23, is attached to the front end of the guideway 11. |