发明名称 SHIPPING WORK PLANNING SYSTEM, SHIPPING WORK PLANNING METHOD, AND SHIPPING WORK METHOD
摘要 <p>This shipping work planning system comprises: storage units (3, 2) for storing product information (31), progress information (32), transportation planning information (33), shipping planning information (34), and equipment information; a target loading time calculation unit (52) for calculating target loading times when loading is performed without waiting for cargo; a general work plan preparing unit (53) for determining, so as to meet the target loading times, work to be performed within a time period that is preset with set time period information for the equipment information and cargo handling equipment and cargo transporting equipment to be used for the work; a detailed work plan preparing unit (54) for determining processing times for cargo handling equipment and cargo transporting equipment operations that are determined by the general work plan preparing unit (53); and a plan output unit (6) for outputting the results created with the detailed work plan preparing unit (54). By virtue of this configuration, a work plan for shipping work, by which shipping products are loaded onto a ship, can be created in a short time.</p>
申请公布号 WO2014061252(A1) 申请公布日期 2014.04.24
申请号 WO2013JP06098 申请日期 2013.10.11
申请人 JFE STEEL CORPORATION 发明人 TOMIYAMA, SHINJI
分类号 B65G63/00;G06Q50/28 主分类号 B65G63/00
代理机构 代理人
主权项
地址