发明名称 High Speed Mine Development Methodology
摘要 Abstract A high speed development methodology for an underground mine is 5 disclosed. The methodology involves the steps of drilling blast holes 12 in a development face using a jumbo drill rig 10 with a longer cut to achieve increased lateral advance. Then charging the blast holes 12 in the development face with a suitable explosive charge; and then, removing blasted material after the charge has been detonated. Typically the high 10 speed development methodology further comprises the step of installing ground support after bogging using a different jumbo drill rig from that used for drilling blast holes in the development face. In use, the net effect is to optimise the development mining cycle and increase the speed of development up to double that of a conventional methodology. Figure to accompany Abstract: Figure 1 C) a. w 0 '-N' 0 p '-p m to * . * 0 * 2 * 0* I', 0 o * I a C.. * C * * . *1I C C, 'a C o C Ct C z C, c-I to -. 0 (0 - K C,
申请公布号 AU2014100151(A4) 申请公布日期 2014.03.20
申请号 AU20140100151 申请日期 2014.02.18
申请人 POSEIDON NICKEL LIMITED 发明人 GEORGE, PETER
分类号 E21C41/16;E21B7/00;F42D3/04 主分类号 E21C41/16
代理机构 代理人
主权项
地址