发明名称 Method for laying a cable in the offshore area from a wind energy plant to a destination and wind energy plant to be sited in the offshore area
摘要 <p>The method involves placing a scour guard (15) at a wind energy plant. A cable drum (10) with a cable is received at the wind energy plant by a submarine vehicle (18) i.e. remotely controlled vehicle. A pivot arm (20) is arranged in a region, which faces towards a rear side (37) of the submarine vehicle, during receiving the drum. The cable drum is transported to a destination by the submarine vehicle under continuous laying of the cable. The cable is introduced into a cable duct i.e. J-tube, at the destination. The cable is completely removed from the cable drum at the destination. An independent claim is also included for a wind energy plant.</p>
申请公布号 EP2704276(A1) 申请公布日期 2014.03.05
申请号 EP20130004184 申请日期 2013.08.24
申请人 STRABAG OFFSHORE WIND GMBH 发明人 WEBER, KLAUS, DR.
分类号 H02G1/10;E02F5/10;F03D11/04 主分类号 H02G1/10
代理机构 代理人
主权项
地址