发明名称 LNG TANK LOADED ON LNG CARRIER, AND METHOD OF MANUFACTURING THE SAME
摘要 PROBLEM TO BE SOLVED: To shorten the construction period of an LNG carrier by assembling an LNG tank on the ground and mounting it in a hold of the carrier.SOLUTION: An LNG tank 5 is formed by placing a cold insulator 7 and a membrane 8 inside a skeleton container 6, and loaded in a hold 2 of a double hull structure. A girder material 9 is welded onto an outer surface of the skeleton container to ensure sufficient reinforcement before a cold insulation work so that the skeleton container is not deformed upon loading. When the tank is loaded in the hold, the girder material of the skeleton container is connected to a hull inner shell 1 to integrate the LNG tank with the hull, and to thereby support the liquid cargo load jointly by the skeleton container and the hull.
申请公布号 JP2014037167(A) 申请公布日期 2014.02.27
申请号 JP20120179105 申请日期 2012.08.11
申请人 MORIMOTO SHINKICHI 发明人 MORIMOTO SHINKICHI
分类号 B63B25/16 主分类号 B63B25/16
代理机构 代理人
主权项
地址