发明名称
摘要 PROBLEM TO BE SOLVED: To provide a hot blast stove control and computing device capable of flexibly controlling an operation of a hot blast stove to continue the operation by suppressing a decrease in thermal efficiency as much as possible in the hot blast stove, even when there is a need to suddenly reduce a heating value of hot blast from the first schedule, the hot blast being supplied from the hot blast stove in a staggered parallel operation to a blast furnace. SOLUTION: A hot blast stove control and computing device 301 includes: means 503a, b, c, d for computing a necessary charged heating value; a means for computing a present charged heating value; a means for computing a present blast heating value; a means for computing a present thermal efficiency value; a means for setting a reference value; a means for determining air reduction and temperature reduction; a means for determining deterioration in thermal efficiency; and a means 505 for computing a correction coefficient of a charged heating value. A charged heating value to the hot blast stove is computed by multiplying the necessary charged heating value computed by the means 503a, b, c, d for computing a necessary charged heating value by the correction coefficient of a charged heating value, the correction coefficient being computed by the means 505 for computing a correction coefficient of a charged heating value. COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP5418375(B2) 申请公布日期 2014.02.19
申请号 JP20100088903 申请日期 2010.04.07
申请人 发明人
分类号 C21B9/00 主分类号 C21B9/00
代理机构 代理人
主权项
地址