发明名称 Catchment facility to be available seismic reinforcement and construction method using the same
摘要 PURPOSE: A catchment facility and a construction method thereof are provided to suppress the generations of cracks on a concrete structure during vibration according to an internal sound wave of water or an earthquake. CONSTITUTION: A catchment facility(1) comprises a base unit(10) and a wall unit(20). The wall unit comprises a first and a second curing layer(23,26), a first and a second adhesive material(24,27), a fiber reinforcing layer(25), and a waterproof sheet(28). The fiber reinforcing layer is a fiber mesh layer manufactured by weaving a fiber of jute material. The fiber of the jute material is cut to a predetermined length and is mixed into the concrete compound comprising a first and second concrete curing layer. The waterproof sheet is attached to one side of the second curing layer by the second adhesive material.
申请公布号 KR101364931(B1) 申请公布日期 2014.02.19
申请号 KR20120018762 申请日期 2012.02.24
申请人 发明人
分类号 E03B3/00;E04H7/02;E04H9/02 主分类号 E03B3/00
代理机构 代理人
主权项
地址