发明名称 JOINT METHOD FOR UPPER STRUCTURE AND GROUND IMPROVEMENT PILE
摘要 PROBLEM TO BE SOLVED: To provide the joint method of an upper structure and a ground improved pile for including a crushed stone layer between the upper surface of a ground improved pile and an upper structure with a geotextile to form a sandbag-shaped crushed stone layer, and for preventing the breakdown of the crushed stone layer.SOLUTION: In the joint method of an upper structure and a ground improved pile, a crushed stone layer 3 between an upper surface 2A of a ground improved pile 2 and an upper structure 4 is included with a geotextile to form a sandbag-shaped crushed stone layer 3.
申请公布号 JP2014005600(A) 申请公布日期 2014.01.16
申请号 JP20120139886 申请日期 2012.06.21
申请人 RAILWAY TECHNICAL RESEARCH INSTITUTE;JAPAN RAILWAY CONSTRUCTION TRANSPORT & TECHNOLOGYAGENCY 发明人 NONAKA TAKAHIRO;KOJIMA KENICHI;YONEZAWA TOYOJI;MORINO TATSUYA
分类号 E02D17/18;E01B1/00;E01C3/04;E02D3/12 主分类号 E02D17/18
代理机构 代理人
主权项
地址