发明名称 |
JOINT METHOD FOR UPPER STRUCTURE AND GROUND IMPROVEMENT PILE |
摘要 |
PROBLEM TO BE SOLVED: To provide the joint method of an upper structure and a ground improved pile for including a crushed stone layer between the upper surface of a ground improved pile and an upper structure with a geotextile to form a sandbag-shaped crushed stone layer, and for preventing the breakdown of the crushed stone layer.SOLUTION: In the joint method of an upper structure and a ground improved pile, a crushed stone layer 3 between an upper surface 2A of a ground improved pile 2 and an upper structure 4 is included with a geotextile to form a sandbag-shaped crushed stone layer 3. |
申请公布号 |
JP2014005600(A) |
申请公布日期 |
2014.01.16 |
申请号 |
JP20120139886 |
申请日期 |
2012.06.21 |
申请人 |
RAILWAY TECHNICAL RESEARCH INSTITUTE;JAPAN RAILWAY CONSTRUCTION TRANSPORT & TECHNOLOGYAGENCY |
发明人 |
NONAKA TAKAHIRO;KOJIMA KENICHI;YONEZAWA TOYOJI;MORINO TATSUYA |
分类号 |
E02D17/18;E01B1/00;E01C3/04;E02D3/12 |
主分类号 |
E02D17/18 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|