摘要 |
The present invention relates to a construction method for the upper structure of a corrugated steel plate prestressed concrete box girder bridge and, more specifically, to a construction method for the upper structure of a corrugated steel plate prestressed concrete box girder bridge comprising: a step of constructing the upper structure of a bridge by installing a temporary strut in a predetermined area protruding from an abutment at the beginning of the bridge around an adjacent pier in the axial direction of the next pier; and a step of repeatedly installing a strut in an area protruding from the next pier in the axial direction and constructing the upper structure of the bridge to complete the entire structure of the bridge. |