发明名称 高炉原料の装入方法
摘要 PROBLEM TO BE SOLVED: To provide a method for charging raw materials into a blast furnace, by which a coke-mixed ore layer can be formed while keeping a mixing rate of coke with ore almost constant from the initial stage of charge to the final stage thereof when coke and ore are charged simultaneously into the bell-less blast furnace from a center feed type apparatus for charging raw materials to form the coke-mixed ore layer in the bell-less blast furnace.SOLUTION: When a coke-mixed ore layer 13 is formed in a bell-less blast furnace 3, the coke is thrown in an upper bunker 2A in such a state that the turning movement of a turning chute 4 of the center feed type apparatus 1 for charging raw materials is stopped, then the ore is thrown in the upper bunker 2A while turning the turning chute 4, thereafter each of opening/closing gates 6A-6D is changed over from a closed state to an opened state to transfer the coke and ore in the upper bunker 2A to a lower bunker 2B.
申请公布号 JP5942929(B2) 申请公布日期 2016.06.29
申请号 JP20130117985 申请日期 2013.06.04
申请人 JFEスチール株式会社 发明人 渥美 日高;柏原 佑介;岩井 祐樹;桑原 稔;後藤 滋明
分类号 C21B5/00;C21B7/18;C21B7/20 主分类号 C21B5/00
代理机构 代理人
主权项
地址