发明名称 BLOCKAGE MANAGEMENT SYSTEM, ON-RAIL TRAIN MANAGEMENT SYSTEM, BLOCKAGE MANAGEMENT METHOD, AND ON-RAIL TRAIN MANAGEMENT METHOD
摘要 PROBLEM TO BE SOLVED: To achieve a system in consideration of upbound and downbound trains on a single-track line.SOLUTION: At a station where single-track lines cross each other, when the arrival of a train 30a at a predetermined position in the area is detected, the blockage of an in-area blocked section A2 at the arrival position is temporarily cancelled. The temporary cancellation means a blocking state which is considered to secure blockage in the same direction and to cancel blockage in the opposite direction. Thus, a train 30b in the opposite direction (downbound direction), which is on rail at the same station, can secure the blockage of the next blocked section (inter-station blocked section) B1 although the next blocked section B1 competes against the in-area blocked section A2 in the opposite direction.
申请公布号 JP2013193625(A) 申请公布日期 2013.09.30
申请号 JP20120064835 申请日期 2012.03.22
申请人 RAILWAY TECHNICAL RESEARCH INSTITUTE 发明人 SASAKI TATSUYA
分类号 B61L23/30 主分类号 B61L23/30
代理机构 代理人
主权项
地址