摘要 |
<p>- 15 - Abstract5In order to produce a slab track for rail vehicles with an emergency pathway (12) for road vehicles, a prefabricated track section with rails (8) and sleepers (5) is supported and positioned on a. substructure (1) by means of a10 supporting and aligning device (4). Subsequently, a track slab (10) is produced by casting in the sleepers (5). The part of the sleepers (5) that projects from the track slab (10) and the rails (8) are separated by formwork elements, and an emergency pathway (12) is applied to the track slab15 (10) by casting.(Figure 9)</p> |