摘要 |
PROBLEM TO BE SOLVED: To provide a plan training device capable of performing training for coping with an unsteady state at activation stop time or abnormal time using an actual plant.SOLUTION: The plant training device of the present invention is a plant training device 1 for performing operation training in an actual plant 100 capable of simulating an abnormal phenomenon, and includes: simulation input means 310 capable of inputting a simulated natural environment around the actual plant 100; simulation generation means 320 for generating a simulated abnormal phenomenon in the actual plant 100; reporting means 110 for actually reporting the fact of the generation when the simulated abnormal phenomenon is generated; and detection means 330 for detecting a procedure for the abnormal phenomenon. |