摘要 |
<P>PROBLEM TO BE SOLVED: To provide a resin system floor having no problems of wiring space capacity and withstand load, facilitating construction and confirmation of cables inside a pit, and capable of reducing manufacturing cost. <P>SOLUTION: A system floor is constituted by laying lightened resin system floor bodies 1 of a skeleton structure over a floor and accommodating protrusions of two types of blocked block columns in column grooves 4 of the system floor bodies 1. The system floor bodies 1 are connected to each other at the upper parts of the system floor bodies 1 by using connecting rings. The block column can be added to the system floor and can easily adjust the height of the system floor. Because a part of the system floor body 1 becomes a lid 5, all of an underfloor part of the system floor can be used as a wiring pit. The system floor body 1 has a confirmation lid 8 enabling cables inside the pit to be confirmed. The confirmation lid 8 can be used for a computer room having a dislike of dust, since it is sealed. <P>COPYRIGHT: (C)2013,JPO&INPIT |