摘要 |
<P>PROBLEM TO BE SOLVED: To effectively utilize surplus electric power which cannot be sold without greatly altering an existing system. <P>SOLUTION: In an electric power system which supplies electric power to a load 40 provided to a consumer 1 using a power generation device for generating electric power by receiving natural energy, an HEMS 100 which controls the load 40 includes a load control part 133 which performs control so as to increase the power consumption of the load 40 on condition that surplus electric power exceeding the power consumption of the load 40 is available in generated electric power from the power generation device 10. <P>COPYRIGHT: (C)2013,JPO&INPIT |