发明名称 Optimisation of a wind turbine
摘要 The invention concerns a method of optimising a construction of a basis (1a, 1b) of a wind turbine (8a, 8b). Thereby, a local load environment situation (LES) of a construction location is analysed, which results in local load-relevant environment data (ED), based on which construction instructions (CI) are generated. These are further based on a set of predefined rules (R) for processing the local load-relevant environment data (ED), such that in a first selected region (15a, 15b) of the basis (1a, 1b) along a circumference of the tower (6a, 6b) and/or in a first selected region of the foundation (4) the carrying structure (2a, 2b) of the basis (1a, 1b) is weakened in at least one selected horizontal cross-section with respect to possible maximum loads in comparison with a second region (13a, 13b) of the basis (1a, 1b) in the selected cross-section. The invention also concerns a basis (1a, 1b) of a wind turbine and a system (35) for optimising a construction of a basis (1a, 1b).
申请公布号 EP2551519(A1) 申请公布日期 2013.01.30
申请号 EP20110175585 申请日期 2011.07.27
申请人 SIEMENS AKTIENGESELLSCHAFT 发明人 LAURBERG, HANS;RASMUSSEN, ANDERS NYGAARD
分类号 E04H12/10;E04H12/08;E04H12/12;F03D1/00;F03D11/04 主分类号 E04H12/10
代理机构 代理人
主权项
地址