摘要 |
32 ABSTRACR SCHEDULING OF DYNAMIC BROADCAST CHANNEL 5 SYSTEM(S) AND METHOD(S) ARE PROVIDED THAT FACILITATE SCHEDULING SYSTERN INFORMATION. SCHEDULING OF SYSTEM INFORMATION EXPLOITS A CONTROL CHANNEL ASSOCIATED WITH A BROADCAST CHANNEL (BCH), AND UTILIZES REFERENCE INFORITIATION (E.G., A TIME REFERENCE OR A SCHEDULING REFERENCE) IN ADDITION TO SYSTEM INFORMATION TYPICALLY CARRIED BY SCHEDULING UNITS (SUS). SCHEDULING PROCEEDS PRIMARILY ACCORDING TO THREE PLANNING 10 TYPES. (I) A SU CARRIES AN INDICATION OF A TIME AT WHICH A DISPARATE SU IS TO BE SCHEDULED IN THE CONTROL CHANNEL ASSOCIATED WITH THE BCH. THE INDICATED TIME IS A SPECIFIC TIME SLOT IN THE CONTROL CHANNEL OR A LOWER BOUND FOR AN ACTUAL SCHEDULING INSTANT. (II) A FIRST SU INDICATES A TIME CYCLE, OR TIME PERIOD, FOR SCHEDULING DISPARATE SCHEDULING UNITS IN THE CONTROL CHANNEL ASSOCIATED WITH THE BCH. (III) A FIRST SU CARRIES 15 A TIME INDICATION TO A SECOND SU IN A SAME CONTROL CHANNEL, THE SECOND SU INDICATES A TIME AT WHICH A THIRD SU IS TO BE SCHEDULED. |