摘要 <p>[Problem] To make it possible to adjust a plurality of individually calculated plans. [Solution] An economic load dispatch adjustment device (10) acquires: an optimal hydroelectric power generation amount, an optimal demand amount, and a generated power unit price, from a supply and demand planning device (23); a planned hydroelectric power generation amount planned by a water-level planning device (21); and a planned demand amount planned by a charging control device (22). The economic load dispatch adjustment device (10) reduces the price of power at times when the planned hydroelectric power generation amount exceeds the optimal power generation amount, and causes the water-level planning device (21) to re-plan the hydroelectric power generation amount. Furthermore, the economic load dispatch adjustment device (10) increases the price of power at times when the planned demand amount exceeds the optimal demand amount and causes the stored water temperature control device (22) to re-plan the demand amount.</p>
申请公布号 JP5106708(B1) 申请公布日期 2012.12.26
申请号 JP20120523139 申请日期 2011.12.06
申请人 发明人
分类号 G06Q50/06 主分类号 G06Q50/06
代理机构 代理人
主权项
地址
您可能感兴趣的专利