摘要 |
<P>PROBLEM TO BE SOLVED: To provide a work management system for replacing a calibration term-expired water meter, the system enabling accurate management of a water meter and status of a replacement work between work-scheduling of the work for replacing a calibration term-expired water meter and returning of a dug-out water meter to the orderer. <P>SOLUTION: A work management system for replacing a calibration term-expired water meter, the system for a contractor to manage a contract work, includes: a management server 10 comprising a replacement work database 11 and a water meter stock database 12; a contract work contractor management terminal 20 for inputting respective pieces of data into a calibration term-expired water-meter replacement work ledger storage zone and a work schedule storage zone, or outputting stored data, by accessing the management server 10, and inputting respective pieces of data into a delivery data storage zone and an assignment data storage zone, or outputting stored data; and a work contractor portable terminal 30 for accessing the management server 10 to accordingly carry out the replacement work based on work schedule data related to the work for replacing the calibration term-expired water meter and sequentially inputting work data on work status. <P>COPYRIGHT: (C)2013,JPO&INPIT |