摘要 |
<p>#CMT# #/CMT# The method involves providing a base element as a module carrier (11) at the erection site, where a pile (6) forms the foundation to be created or is a component of the foundation. The pile is implemented as a hollow body. The pile is clamped in a pivot module, by erecting the pile by pivoting the pivot module, until the desired driving direction into the ground (9) relative to the horizontal is achieved, by locking the pivot module after erecting the desired slope, by sinking the pile to the floor (8) of the water system (7) and pressing it into the floor until a limit value of a driving. #CMT# : #/CMT# Independent claims are also included for the following: (1) a device for creating an underwater foundation of a building; and (2) a pivot device for pivoting a pile in the creation of an underwater foundation. #CMT#USE : #/CMT# Method for creating an underwater foundation of a building. #CMT#ADVANTAGE : #/CMT# The method involves providing a base element as a module carrier at the erection site, where a pile forms the foundation to be created or is a component of the foundation, and thus ensures a quick underwater foundation creating method. #CMT#DESCRIPTION OF DRAWINGS : #/CMT# The drawing shows a partial sectional side view of a device for creating an underwater foundation. 6 : Pile 7 : Water system 8 : Floor 9 : Ground 11 : Module carrier.</p> |