摘要 |
A method for the development of a gas-condensate deposit includes development of deposit with a system of producing wells and formation-pressure maintenance with use of cycling process due to back injection of separated gas to pressure wells. At the first step the deposit is depleted up to decrease of formation pressure to the level not lower than, and at the second step one maintains it at that level with use of cycling process, and the inputare controlled according to the relationship,where- pressure of beginning of condensation (MPa),- volume of re-circulation gas (th.m),- coefficients of super-compressibility of fat gas and leakage gas,- part of fat gas in production of producing wells. |