发明名称 CONSTRUCTION METHOD FOR BOUNDARY STONE ON ROAD
摘要 PURPOSE: A construction method of a road boundary stone integrated with a side gutter using plain concrete is provided to simplify the construction process of a road boundary stone by simultaneously constructing the road boundary stone and a side gutter. CONSTITUTION: A construction method of a road boundary stone integrated with a side gutter using plain concrete is as follows. A construction plane for a road boundary stone is excavated(110). Construction plane forms are installed on both sides of the construction plane and are bound using boundary stone supporting and binding bars(120). Boundary stone construction grooves are formed along the construction plane forms by moving a push bar with construction groove forming portions(130). Boundary stones are installed in the boundary stone construction grooves(140). The installed boundary stones are hit to control the heights of the boundary stones(150).
申请公布号 KR20120102457(A) 申请公布日期 2012.09.18
申请号 KR20110020635 申请日期 2011.03.08
申请人 PARK, CHEONG MIN;JUNG, GIL SU 发明人 PARK, CHEONG MIN;JUNG, GIL SU
分类号 E01C11/22;E01C19/50;E01C19/52 主分类号 E01C11/22
代理机构 代理人
主权项
地址