发明名称 WELL CONTROL OPERATIONAL AND TRAINING AID
摘要 A method and system to aid and/or train well control personnel by measuring the actual hydraulic delay and pressure attenuation of operator choke changes during well control operations or simulations. This provides the choke operator with an anticipated drillpipe pressure as soon as the choke is adjusted, accounting for hydraulic delay, pressure attenuation and prior choke adjustments that are currently travelling through the wellbore as well as reflections of the transient pressure waves against the pumps and choke. The technique that is described utilizes only three inputs, and works without knowledge of or inputting data such as well depth, pipe and hole geometry, mud properties, temperature, water depth, land, offshore platform or floating (subsea BOP's) drilling rigs. Further, the system can detect and warn the operator of potential problems based on the results of the real time analysis.
申请公布号 WO2012078406(A3) 申请公布日期 2012.09.13
申请号 WO2011US62376 申请日期 2011.11.29
申请人 MOUTON, DAVID, E. 发明人 MOUTON, DAVID, E.
分类号 E21B44/06;E21B21/08;E21B45/00;E21B47/00;G05B13/02 主分类号 E21B44/06
代理机构 代理人
主权项
地址
您可能感兴趣的专利