发明名称 |
CONTROL METHOD FOR POWER SUPPLY SYSTEM, AND POWER SUPPLY SYSTEM |
摘要 |
<P>PROBLEM TO BE SOLVED: To make it possible to perform demand control of power properly and certainly. <P>SOLUTION: A power supply system 1 having a configuration in which a first power generator agent PV1 and a second power generator agent PV2 transmit real time generated power PG1 and PG2 of their own power generators to a load agent EV, and the load agent EV performs power consumption control by calculating region request amount AR based on these generated power and power consumption of the own load: specifies a similarity period in which change of the generated power PG1 in a predetermined period except a missing period is similar to the change of the generated power PG1 in the missing period, when there is the missing period in which the generated power PG2 is not received from the second power generator agent PV2; and calculates the region request amount AR by acquiring the change of the generated power PG2 in the similarity period as the generated power PG2 in the missing period. <P>COPYRIGHT: (C)2012,JPO&INPIT |
申请公布号 |
JP2012157132(A) |
申请公布日期 |
2012.08.16 |
申请号 |
JP20110013133 |
申请日期 |
2011.01.25 |
申请人 |
CHUGOKU ELECTRIC POWER CO INC:THE |
发明人 |
OGAWA AKIHIRO |
分类号 |
H02J13/00;H02J3/00;H02J3/46 |
主分类号 |
H02J13/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|