发明名称 METHOD FOR SHUTTING DOWN TURBOMACHINE
摘要 <P>PROBLEM TO BE SOLVED: To provide a method for increasing the operational flexibility of a steam turbine during a shutdown phase. <P>SOLUTION: The method 400 for improving the operational flexibility of a turbomachine during the shut down phase is provided. The turbomachine may include a first section, a second section, and a rotor disposed within the first section and second sections. The method 400 may determine an allowable range of a physical parameter associated with the first section and/or the second section. The method 400 may modulate a first valve and/or a second valve to allow steam flow into the first section and the second section respectively, wherein the modulation is based on the allowable range of the physical parameter. In addition, the physical parameter allows the method 400 to independently apportion steam flow between the first section and the second section of the turbomachine, during the shutdown phase. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP2012127352(A) 申请公布日期 2012.07.05
申请号 JP20110274426 申请日期 2011.12.15
申请人 GENERAL ELECTRIC CO <GE> 发明人 SATHYANARAYANA DILEEP;KLUGE STEVEN CRAIG;BAKER DEAN ALEXANDER;PALMA STEVEN DI
分类号 F01D21/00;F01D21/14;F01D21/16 主分类号 F01D21/00
代理机构 代理人
主权项
地址