发明名称 Installing method for anchor cage and installing method for industrial equipment
摘要 <p>The present invention relates to an installing method for an anchor cage and a method for installing industrial equipment, wherein the installing method for the anchor cage includes the following steps: providing an anchor flange, wherein a plurality of first bolt holes are dispersedly arranged on the anchor flange along a circumferential direction thereof, and said first bolt holes comprise a first group of bolt holes and a second group of bolt holes; providing a template flange, wherein a plurality of bolt holes are arranged on the template flange along a circumferential direction thereof, said plurality of bolt holes comprise a first group of bolt holes and a second group of bolt holes, the first group of bolt holes of the template flange correspond to the first group of bolt holes of the anchor flange, and the second group of bolt holes of the template flange correspond to the second group of bolt holes of the anchor flange; providing a shimming flange, wherein a plurality of bolt holes are arranged on the shimming flange along a circumferential direction thereof, and the bolt holes correspond to the first and second groups of bolt holes of the anchor flange; assembling and fixing lower ends of part of anchor bolts in the first group of bolt holes of the anchor flange; assembling upper ends of the part of anchor bolts in the first group of bolt holes of the template flange correspondingly; adjusting and fixing all the anchor bolts after the rest anchor bolts penetrate through the second group of bolt holes of the anchor flange and the second group of bolt holes of the template flange; binding reinforcing steel bars and pouring concrete below the template flange to form a reinforced concrete platform; and taking the template flange down and assembling the upper ends of all the anchor bolts in the plurality of bolt holes of the shimming flange correspondingly. The above installation method in the present invention can be used for installing the anchor cage of the industrial equipment. With the adoption of the installing method, the installing difficulty of the anchor cage is lowered and the installing precision of the anchor cage is improved at the same time. 2976989_1 (GHMatters) P88912.AU 24/I 1/11 the lower ends of part of anchor bolts in the anchor cage 101 are dispersedly assembled and fixed in the first bolt holes 11 of the anchor flange along the circumferential direction of the anchor flange _ _102 the upper ends of said part of anchor bolts are correspondingly assembled in the bolt holes of the template flange all the anchor bolts are adjusted and fixed after the rest anchor bolts in said anchor cage penetrate through the first bolt holes 15 of said anchor flange and the rest bolt holes of said template flange reinforcing steel bars are bound and concrete is poured below said template flange to form a reinforced concrete platform tF- 105 said template flange is taken down and then the upper ends of all the anchor bolts are correspondingly assembled in the bolt holes of the shimming flange Fig. I</p>
申请公布号 AU2011253650(A1) 申请公布日期 2012.06.14
申请号 AU20110253650 申请日期 2011.11.24
申请人 SINOVEL WIND GROUP CO., LTD. 发明人 ZHU, HONGBING
分类号 E02D27/32;E02D27/00;E02D27/50;E04C5/12 主分类号 E02D27/32
代理机构 代理人
主权项
地址