发明名称 |
WIND ENERGY INSTALLATION WORKING GANTRY AND WIND ENERGY INSTALLATION |
摘要 |
The invention relates to a wind energy installation working gantry having a working platform and railings arranged on the working platform, wherein the railings can be blocked off by means of a blocking element and the blocking element is be arranged in a transition region to an elevator. The invention relates in particular to a wind energy installation having a locking device comprising a locking mechanism for receiving a first locking element and a second locking element, wherein the first locking element is connected to the elevator and the second locking element is connected to the blocking element, and the locking mechanism is designed to release one of the two locking elements by locking the respective other locking element relative to the locking device. The invention further relates to a locking device, to an elevator and to a wind energy installation. |
申请公布号 |
WO2012019815(A3) |
申请公布日期 |
2012.04.26 |
申请号 |
WO2011EP60219 |
申请日期 |
2011.06.20 |
申请人 |
WOBBEN, ALOYS;MUELLER, JOHANN |
发明人 |
MUELLER, JOHANN |
分类号 |
F03D1/00;B65G1/08;B65G13/12 |
主分类号 |
F03D1/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|