摘要 |
<p>When load control is activated by a local or remote mechanism to control a load, the method and system use a usage profile of the load and one or more of (1) interval start times, (2) ON/OFF or OFF/ON cycling and (3) predefined periods during which load must not be allowed to run (e.g., dead zones) to determine when a particular piece of equipment is allowed to shed or run thereby reducing the probability of occurrence of cyclical and non-cyclical aggregate peaking of usage wherein cyclical peaking is manifested as an artifact of the local load control rules during a load control event.</p> |