摘要 |
A method to increase oil production from an oil well comprising a plurality of production zones is presented, wherein the method selects a production zone, isolates that selected production zone, and reconfigures flow lines to allow direct injection of materials under pressure into the selected production zone. The method determines a treatment pressure based upon soil porosity in the selected zone, injects a brine solution into the selected production zone at the selected pressure, and maintains the selected pressure in the selected production zone for at least 72 hours.
|