摘要 |
A riser installation method including the steps of providing a first vessel situated over a hydrocarbon well, supporting a hydrocarbon transfer duct from the first vessel by a first end that is attached to a lowering device on the first vessel, and attaching a second end of the hydrocarbon duct to a second vessel, at a position near the first vessel. The method also includes the steps of lowering the transfer duct, increasing the distance of the second vessel from the first vessel, pulling the transfer duct until the second vessel is near the third vessel, contacting a section of the transfer duct with the sea bed, displacing the second end of the transfer duct from the first vessel, returning the second end of the transfer duct to the mooring position, and bringing the second end of the hydrocarbon transfer duct in fluid communication with the third vessel. |