<p>A method of constructing a boom assembly of a front end loader, including the step of providing connection of a first and second boom member 12, 14 with a cross bar 24 via a pair of shaped plates 30 which strengthen said connection while providing means for a hose to pass through said first or second boom to a location outside of said cross bar. Additional cabling plates can be provided, the additional plates providing a radiused duct 19.79 for the passage of a hose. The additional plates can include a passageway 19.71 for electrical wiring.</p>
申请公布号
EP2152975(A4)
申请公布日期
2012.01.18
申请号
EP20080733452
申请日期
2008.05.06
申请人
CHALLENGE IMPLEMENTS HOLDINGS PTY LIMITED
发明人
WEBB, DANIEL;SMITH, TIM;O'SHAUGHNESSY, COLLIN;HEALEY, CRAIG;HEALEY, JOHN