发明名称 CCS OPERATION PLAN SETTING SYSTEM
摘要 <P>PROBLEM TO BE SOLVED: To provide a CCS operation plan setting system which can set power generation amount and CO<SB POS="POST">2</SB>capture rate of each CCS for minimizing total power generation costs by using specific power generation consumption characteristics and output following characteristics, in establishing operation plans of different two or more CCSs. <P>SOLUTION: A CCS operation plan setting system comprises: a condition setting part 11 from which a setting item such as an object period and time width is input when a CCS operation plan of a power plant having different two or more CO<SB POS="POST">2</SB>capture/storage facilities is established; an individual CCS characteristics acquisition part 12 acquiring specific power generation consumption characteristics and output following characteristics of the respective power plant; an optimum operation condition calculation part 13 calculates, based on the acquired information, power generation amount and CO<SB POS="POST">2</SB>capture rate of the respective power plant to minimize the total power generation costs including a plurality of the power plants by using relation between the power generation amount and the CO<SB POS="POST">2</SB>capture rate of the respective power plant; and a calculation result output part 14 through which they are output. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP2012010455(A) 申请公布日期 2012.01.12
申请号 JP20100142551 申请日期 2010.06.23
申请人 TOSHIBA CORP 发明人 NODA HIDEKI;OBARA REIKO;KOBAYASHI TAKENORI
分类号 H02J3/00;C01B31/20;G06Q50/06 主分类号 H02J3/00
代理机构 代理人
主权项
地址